Method & assumptions
- Area = Σ L × W + extra; order = area × (1 + waste); boxes = ⌈order ÷ coverage⌉.
- Material cost = boxes × coverage × price per unit area (you pay for full boxes).
- Underlayment rolls = ⌈area × 1.05 ÷ roll coverage⌉ (5% for seams and trimming, our assumption).
- Total = (material + underlayment) × (1 + tax) + (install + removal) × area + extras.
- 1 ft = 0.3048 m; 1 sq ft = 0.09290304 m²; $/sq ft × 10.7639 = $/m².
Defaults
Waste by layout (10/15/20%) is a common rule of thumb. Box coverage (20 sq ft; 15 for tile), material price ($3/sq ft) and underlayment ($30 per 100 sq ft roll) are placeholders, not market averages. Enter values from the actual product in USD or CAD.
Unit-tested, including metric round-trips.